De Minimis

About us/Implemented applications/

De Minimis
In the Freeport, the seawall was restored and a pontoon was built.

THE PROJECT OF CSEPEL PORT SERVICE PROVIDER KFT. HAS BEEN COMPLETED IN THE FREEPORT OF BUDAPEST

The river wall of Csepel Port has been restored and has been built on the spot within the frameworks of the project implemented with an EU support of HUF 58.54 million.

The aim of the project was to facilitate better logistics services for freight transport in Hungary by developing the elements of traffic infrastructure.

Between December 2014 and June 2015, the development of the port was carried out with the help of HUF 58 540 350 support amount, through tender no. KÖZOP-4.6.0-14-2014 titled “Development and modernization of the basic infrastructure of the port", within the frameworks of the New Széchenyi Plan.

The investment has included the restoration of the so-called “Nyíltrakodó” river wall, which was damaged by the major floods of the 2000s, and has also included the provision of a safe, mobile exit for the vessel traffic of the port, by replacing the old exit which could no longer be renovated. The 1800 m2 river wall was restored in January 2015, after which the on-site construction was carried out in June.