A new vertical and sloping river wall, a new track along the river wall and a capacity-enhancing railway track were built together with a dredging within the frameworks of this project (2007-2008). The new river walls allow for the port to continuously accommodate vessels with larger draught as well, and allow the wintering of vessels and repairs to be performed on water.
KIOP-2.2.2-2-2007-10-0001/1